Pile removal method - メーカー・企業と製品の一覧 | イプロス

Pile removal methodの製品一覧

1~1 件を表示 / 全 1 件

表示件数

Post-Removal Method "OK Method"

We can extract any type of pile from the tip! Choose from three types of pile extraction methods tailored to the site.

The "OK Method" is a pile extraction technique that forcibly chucks the tip of the pile using a special casing, allowing for the extraction of existing piles from the tip. It enables proper backfilling simultaneously with the extraction of the pile. As it is a noiseless and vibration-free method, it can be implemented in various locations, including urban areas, office districts, and residential areas. 【Features】 ■ Safe construction ■ Smooth operation ■ Short construction period ■ Noiseless and vibration-free work *For more details, please download the PDF or feel free to contact us.

  • Renovation and repair methods
  • Special Construction Method
  • Civil Engineering Method
  • Pile removal method

ブックマークに追加いたしました

ブックマーク一覧

ブックマークを削除いたしました

ブックマーク一覧

これ以上ブックマークできません

会員登録すると、ブックマークできる件数が増えて、ラベルをつけて整理することもできます

無料会員登録